Accomplishments & Progress in 2001 |
|||||||||||||||||||||||||||||||
SSE inside corner. There are big gaps and holes all the way through the wall. |
Same view but with repairs in progress. |
||||||||||||||||||||||||||||||
Jared Turley (Richard & Susie's son) repairing / replacing bricks on the inside of the JBHome the east wall of the SE corner. Note: The exterior walls are about 16" thick. The outside course is of hand-made brick but the inside two courses are of adobe. The plaster is 3 layers thick. 1st is of mud and 1/2" to 3/4" thick. The 2nd is a sand & lime plaster and the 3rd is a very thin and smooth lime plaster. |
|||||||||||||||||||||||||||||||
Jared Turley (Richard & Susie Turley's son) helping to prepare for fixing the bricks on the ESE corner of the JBHome. We dug down to below the top of the foundation, which is a few layers of big stones. Note all of the bricks that need to be replaced. |
|||||||||||||||||||||||||||||||
J.C. (Virgil & Kari Bushman's son) cutting out the rotten floor joists in the SE room of the JBHome. This had been the bathroom. Old water & sewer pipes were then removed. |
|||||||||||||||||||||||||||||||
Bob Turley preparing brick for replacement and clearing old mortar joints. Bob spent a few weeks working on bricks on the JBHome with me. His brother Jay also spent some time helping us with the "tuckpointing" of mortar joints. |
|||||||||||||||||||||||||||||||
Susie Turley "harvesting" good bricks from the lean-to kitchen area for use in repairing lost bricks on the main house. This entire kitchen area will be rebuilt later. |
|||||||||||||||||||||||||||||||
Note where several broken or spalled bricks have been removed in preparation for replacement. |
|||||||||||||||||||||||||||||||